Cuivre River Electric Coop Inc Electricity Rates and Average Bill (Missouri)
Data through May 2026 (the latest month EIA has published) · Updated August 14, 2026
As of May 2026, Cuivre River Electric Coop Inc's residential customers in Missouri paid an average effective rate of 13.15¢/kWh with an average monthly bill of $117.69, per EIA Form 861-M data. That rate is 0.5¢ below the Missouri average of 13.68¢/kWh; the U.S. average is 18.44¢/kWh.
Rate trend vs the Missouri average
View this chart as a table (last 12 months)
| Month | Rate (¢/kWh) | Avg bill ($/mo) | Avg usage (kWh/mo) |
|---|---|---|---|
| June 2025 | 12.34 | 128.63 | 1042 |
| July 2025 | 11.24 | 169.02 | 1504 |
| August 2025 | 11.14 | 173.00 | 1553 |
| September 2025 | 11.73 | 148.72 | 1268 |
| October 2025 | 12.21 | 127.47 | 1044 |
| November 2025 | 12.50 | 127.54 | 1020 |
| December 2025 | 11.23 | 156.81 | 1396 |
| January 2026 | 10.96 | 189.24 | 1726 |
| February 2026 | 10.63 | 199.31 | 1875 |
| March 2026 | 11.70 | 135.24 | 1156 |
| April 2026 | 12.71 | 127.44 | 1003 |
| May 2026 | 13.15 | 117.69 | 895 |
Cuivre River Electric Coop Inc vs Missouri vs the U.S.
| Cuivre River Electric Coop Inc | Missouri | U.S. average | |
|---|---|---|---|
| Rate (May 2026) | 13.15¢/kWh | 13.68¢/kWh | 18.44¢/kWh |
| Average monthly bill | $117.69 | $111.39 | $135.70 |
| Average monthly usage | 895 kWh | 814 kWh | 736 kWh |
| Rate change, 1 year | +2.9% | +5.1% | +6.2% |
Estimate a bill at Cuivre River Electric Coop Inc rates
Worked example: 1,000 kWh at Cuivre River Electric Coop Inc's average effective rate of 13.15¢/kWh is about $131.50. The utility's actual average usage is 895 kWh/month, which produces the $117.69 average bill. This is an all-in average (energy, delivery, fixed charges, riders); your tariff's marginal price will differ.
See the full Missouri rate trend, look up another utility by ZIP code, or read why electric bills are rising.
Source: EIA Form 861-M (monthly utility-level sales to ultimate customers, residential), published with roughly a two-month lag. Rate = revenue ÷ sales; bill = revenue ÷ customers. Months failing basic sanity screens are excluded. See methodology.